Single-family house (Yongin, 25 pyung, fault)

in #review07176 years ago

Single-family house (Yongin, 25 pyung, fault)

When I saw you, you made me a good quality home.

I recently built a single-family house to share my experience.

I think that it is easy to understand the cost of the construction because I have already arranged the expense from the beginning in Excel.

The location is Yongin, and the field which had originally cultivated the crops was built by changing some of the fields to the ground.

Watch the internet

I will also go to the fair like SETEC

I was worried about whether I was going to be a mate, a passive (fully assembled) or a neck.

We decided to build a lightweight structure that is also fast and cost-effective insulation.

Parents who are aged In fact, I decided to build a single layer without loft to minimize the cost.

The selection of the construction company is the most important, and there is a possibility that the company that is eating money in the middle,

This is why it means that you are 10 years old when you build a house.

I do not care if you do not have this kind of thing. (I can understand only the person who built it)

That's why I picked Megan Housing.

http://www.meegun.co.kr/

Can I uncover the vendor? I want to contact you for more than a year.

(The above vendor is one of the options, it may not be an absolute choice.

I am a medium sized company, but I have just started construction of a single house and have been told that it is expanding business to this side.

Once the house is built, it will be listed as a construction example on the homepage.

Because it becomes a portfolio, the business has to pay more attention.

For example, some of the architectural offices just look at designs,

There are a lot of places that I do not think about living, but just want to be pretty, original, and expensive.

I contracted at the end of Django with a 25-pyeong single-storey structure. (410 per pyeong)

-> room 2, bathroom 1, multi-purpose room 1, living room

(Room is a little small, toilet, living room a little wide)

However, the penalty is attached if the horse is 410 or less than 30 pyeong. I tied this to 5%

The amount of construction has come to 120 million, including civil engineering (for buildings), incoming construction (for silence), sinks + shoemakers.

Average Price (A) Addition (B) Total Price
Basic charge addition (5%) Surcharge (10%) Total civil works Incoming construction furniture (Think, shoes)
20 410 8200 820 9020 570 627 550 1747 10767
23 410 9430 943 10373 570 627 550 1747 12120
25 410 10250 512.5 10762.5 570 627 550 1747 12509.5
30 410 12300 12300 570 627 550 1747 14047

After the contract on May 24, 18, I moved in around May 19.

The long time difference between the time of contract and the time of moving in is due to the fact that the taxes on farmland conservation (tax)

I tried to save it, but eventually I had to pay it.

Because of this, I forgot a few months time. (I think the tax is too bad)

Because the land coverage rate is 20%, the change of usage was about 120 pyong

It turns out that roads right below the land are also roads or roads, parents are the owners

(The former farmers made some of the land a little bit, but the farmers became the road of the present,

Some of these roads also have a ridiculous Ward instruction (about 40 pyeong) to change their usage

As I rolled my head to change this as small as possible, it took several months.

As a result, I had to pay 14 million won to pay for the farmland maintenance charge due to the change of usage.

(The thieves !!!, why do I pay taxes to build a house in my land ???)

700 licenses (civil engineering + architecture) of site development name

270 to boundary survey

Reinforcing soil and other civil engineering costs 850

Road shredding and landfill amounts to 350 and so on.

Ha ~ So you are saying that you are 10 years old ...

As we proceeded to make a pancake, we exceeded our initial projected amount (125,000 + 2 ~ 3,000), and the project was completed at about 1.8 billion won.

It is a trap that I could not construct the fence and gate of the front part of the building yet.

I'm considering slowing down or just putting it ... Yes. (Three fences on the building are white fences)

When I am doing this construction, I understand one of the big problems of the Korean building system.

The construction cost per pyeong is about the pure construction cost, and there are many other places to go.

There are various items, each one is costly, and there are times when we have to wait for time and there are things that are not.

-> These costs do not tell anyone. The architectural company does not tell me that it is the share of the owner.

However, it is not easy to say that the architectural company has had such a cost since.

Because it depends on the location of the land and the building, there is no set standard.

I would like to have a system that evaluates some of these items to some extent before building.

The following is a detailed description of the cost expenditure.

Overall, I build a house for the purpose of both parents and factories, and all kinds of houses are based on those standards. (Overall, the cost is low)

Construction progress payment contents
NO Remittance date Amount Purpose
1 May 24 12,500,000 Deposit (including VAT)
2 June 12 6,800,000 Licenses (civil engineering, architecture)
3 13,928,400 Farmland maintenance charge
4 October 30 1.5 million state-owned property authorization
7 October 30 2,687,300 Boundary survey, parting survey
8 December 20 4,200,000 Civil engineering cost (Reinforced earth estimate) -1 car
9 December 28 4,247,000 Civil engineering cost (estimate of reinforced soil) - Balance
10 December 30, 3,500,000 roads crushing and landfill (incoming construction)
11 Jan. 03 890,000 Change in design change
12 Jan 03 240,000 Change in interior change
13 Jan. 03 25,000,000 Deposits received
14 Jan 19th 37,500,000 Primary payment
15 February 02 37,500,000 Secondary payment
19 Mar 09 09 450,000 Additional connection work with exquisite pipes
20 March 13 14,700,000 balance First
21 June 15 1,000,000 Final balance
22 0 Sink (Hanssem Euro 9000 Purple White 6.5M)
23 0 Shoe box (Hanssem)
24 0 External faucet
25 0 Seawater reclamation (2t)
26 0 Entrance door eaves (porch) 0.57 pyeong
27 0 Deck 4.7 pyeong
28 0 Built-in chapter (Hanssem)
29 Jan. 29 242,000 KEPCO Dong Yong branch office main exhibition fee
30 March 07 1,779,000 Waterworks Waterworks Corporation
31 April 19 383,900 Current Survey
32 873,820 Acquisition tax (change of designation)
33 3,828,160 Acquisition tax (building)
34 300,000 registration fee
35 Total unpaid amount 0 Total remaining amount (paid several times in the future)
36 Total tax 25,522,580
37 Note (note) payment system 129,330,000
38 Current payment total 174,049,580

In-house progress review (regardless of the construction cost) - Will the whole below be 10 million won?
NO Remittance date Amount Purpose
1 Jan. 29 25,000 Building License Plate Issued
2 March 22, 300,000 yards
3 March 26 400,000 barrier seats (29M)
4 Mar 26 1,700,000 white - mesh type fence (73M)
5 May 09 110,000 yard lane - Additional (Left / Right / Backyard) 3.5t
6 May 15 50,000 TV cabinets
7 May 15 479,000 TV
8 May 19 1,093,010 Sofa (4 people) + dining table (6 people)
9 May 19 150,300 quilt, pillow etc.
10 May 20 1,335,830 Air conditioner
11 May 20 463,660 Washing machine
12 May 20 1,860,000 Containers 3 * 6 New
13 May 22 125,000 Pre-installed refrigerator
14 May 22 Kimchi refrigerator was installed before
15 May 22 TV broadcast installation
16 June 03 27,900 tableware drying room 2nd stage
17 June 03 57,800 Clothes hanger * 2
18 June 03 21,200 Laundry Clothes (removable)
19 June 03 13,900 Non-slip hanger
20 June 03 21,800 Non-slip pants rack
21 June 07 400,000 freight shelves (containers)
22 June 07 Living room shelves (3-5 stages) + wheels?
23 Jun 07 Multipurpose room shelf + wheels?
24 June 07 Floor mats (thick)
25 this week? Microwave
26 Dining table and chair, non-slip accessories
27 bath chair
28 Pedestal or low chair
29 Tanning windows on the veranda
30 Fence saplings
31 0 Main Gate
32 sun room
33 cups, bowls, cutlery, pots, etc.
34 Curtains (or blinds)
35 final total 8,634,400
36 Current Payments 8,634,400

If you have any questions, please contact megan housing.

The final photo of the completed house does not have a fence or gates, so it does not get tangled or embarrassed.

-> I see the case of the homepage of that company - -;

I am currently living in an apartment and someday I would like to build it back in a gable style (high living room ceiling) with 2.5 floors (with a loft and a fireplace)

Parents are satisfied that the stress of the past is getting wider.

I would like you to help a little bit in the construction cost calculation.