Changing the style of a bathroom.
Hello friends, welcome to my blog; The first step for the remodeling of this bathroom is the demolition, we threw away all the tile that it had, we only left those dolphins to show how we work and what your new bathroom will be like.
Removal of all tiles and bathroom accessories.
As you can see, all the tiles have already been removed, on the floor, on the walls that were the wet areas, in this new proposal the lining is no longer going to be only the wet areas as it was previously, which is in the shower area, be on all the walls.
Firm or floor removal for installation of the new pipe.
We mark the location of our new furniture to provide the workers with information, so here are our drawings, our graffiti, so now it's the plumber's turn to make his returns here on the floor, we're going to shave so we can put new pipe, most of it is of no use to us.
Installation of the water and sanitary pipe.
Once what was necessary had been demolished, we realized that when breaking all the firmness that it had, below that it had a fill and that fill was not mixed with the cement, it was loose stone and we have already seen that in the works that we have worked on before, well they did like this before; but right now is when the problems are seen and for example, when there is some filtration due to lack of maintenance, as all this remains hollow because it stagnates there and humidity is created, fungi are created, saltpeter, which we see in the lower part.
Plaster removal
After this, it is time to fill in and start plumbing the walls because we voted on all the plasters, since we found the surface very collapsed, and to save stucco we did it again, this way it will be easier to place the pieces of the tiles so that don't get so much mixture in, for example, if we had a belly, more adhesive would get in and that's not ideal.
Leveling of the walls and floor.
Once the plumb plaster has been placed, the filling with the slope including a tray, the sanitary and hydraulic pipes and the outlet of the mixer
of the shower that is going to work at high pressure, we can install the tile.
At this point we present our tile and our breakdown; I proposed a central line in the center of the drop of the shower and part it on the sides, so that it looks symmetrical and it will go up the walls with this same finish on the entire floor, the marble will be on the walls remaining and a wooden detail right in the center, behind the double WC, a line.
High quality stucco ceiling finish.
Once the placement of the tiles is finished, the stucco is placed on the ceiling, white stucco, and from there the only thing missing is the paint; At this point we are ready to start placing furniture, toilets, mirror, toilet, tempered glass, one fixed and the other folding; and the showers that we have available.
The wc are with double discharge
The furniture floated because it has no support at the bottom.
This is the final delivery, this is how our remodeling work that you followed turned out, you can suggest something in the comments that you think, if you like it, thanks for your time.
I hope the information is useful when making a decision, do not forget to support me and we will read next time, bye.
I think that the remodeling work was very clean and nice I am sure that the people in the house were satisfied, something that I like to see is what the previous owners or architects did because usually there are always damaged pipes, bad electrical wiring or put a bad coating which in this case let it happen and take the way moisture with fungus is good to know that everything was changed for the safety of the owners. congratulations to the work team.
That's right, sometimes the old construction methods become obsolete, others instead are good practices that must be preserved; That's how it is, you must rectify the bad and improve the good!
Thank you! that you are very well
beautiful result. You must have worked hard to change this.
Indeed, it is a great effort that is worth it; we are a multidisciplinary team; but the great merit goes to the workers, who put enthusiasm into everything, it is not easy to get a team like this, it has been sifted.
Greetings friend.
Congratulations @jhonnygo! We're delighted to specially curate your awesome publication and award it RUNNER-UP in Architecture Brew #74. More power!
Thank you for subscribing to Architecture+Design, an OCD incubated community on the Hive Blockchain.
Thanks, again! Thanks a lot!
You are welcome, dear @jhonnygo! 😀
Remodels involve a lot of work but if the final product exceeds expectations then it shows us that it was worth the effort. Good job, it looks great.
That's right, thank you for taking an interest in my publication.
Wow, well done and you have done a great job.
Thank you, but it's thanks to everyone, especially the master builders, that's why they call him master...
Greetings friend!
You're welcome (^_^)
Making a new construction for the bathroom with neat and perfect results is a satisfaction for the family, congratulations on remodeling your toilet it looks very good, clean and tidy 🤗
If they were very satisfied, it is not easy and it is not very cheap, but the bathroom is one of the environments where no effort or resource should be spared; because it can become a headache.
greetings friend
Congratulations @jhonnygo! You have completed the following achievement on the Hive blockchain and have been rewarded with new badge(s):
Your next target is to reach 4500 upvotes.
You can view your badges on your board and compare yourself to others in the Ranking
If you no longer want to receive notifications, reply to this comment with the word
STOP
Check out the last post from @hivebuzz:
Support the HiveBuzz project. Vote for our proposal!
Wow!!!!
You are definitely a guru in your line of work....you had a nice work there, so clean and classy
Thanks to many people that the finish turned out very well, I forgot to put the image of the bathroom before the remodeling, it would have been a good point of comparison.
Thank you for your interest in my publication!
You are most welcome
I really love the job, its well done
Dear @jhonnygo, we need your help!
The Hivebuzz proposal already got important support from the community. However, it lost its funding a few days ago when the HBD stabilizer proposal rose above it.
May we ask you to support it so our team can continue its work?
You can do it on Peakd, Ecency,
https://peakd.com/me/proposals/199
All votes are helpful and yours will be much appreciated.
Thank you!