In an Aramco Project I worked in Aceh Barat Daya, this project failed to do it, due to the aramconya collapsed. This is because the planning consultant does not accurately calculate the existing load above this aramco, the 4.8 meter aramco is collapsed because it does not accept the load that is accommodated.
We as a contractor run what is planned by the consultant planner. Before we run this job, we discuss, exchange opinions with services that aramco work is not feasible first because the planning does not make a concrete blanket on aramco.
With the time already narrow given the contract date has been running we were forced to carry out the work in accordance with what has been planned by the consultant.
After we run all the work items to completion, then we are free from the work we do, and finally our project apparently failed to re-unload. We were forced to replace the broken plate.
Steemian friends here are my experience in running projects that are not accurate with field conditions, if in case of inaccurate planning with field conditions do not try to run it. Up here just friends @ steemit, hopefully my post is useful for steemian friends.
Thank you for everything