The first and second day in the second week, we continued the Hostel build.
Yesterday I was doing a floor and making a door hing and some triflels. The build of the floor was harder than I had thought, but finally I managed to do it.
Moreover I increased the walls and furnished the reception, and I made a mat. The preparation of the mat was quite difficult.
The lounge room has almost finished, but there are some little things left.
Today I built the outside of the Hostel and I was doing the smoking place.
Took alone time to build the roof and a floor. Pay attention of the details to reflect the reality, for example the boards, bricks, dustbins and many other little things.
At the end of my working hours I worked out the stairs in detail.I've been dealing with a lot of details so I think I did not do much.
Thank you for taking a couple of minutes to my blog and showing intrests towards my job.
Keep up the good work ;)
Incredible indeed !!!