The condition of the physical infrastructure building of Cut Meutia public hospital before the repelita is still very simple, ie in the form of Dutch heritage buildings. Additional buildings built in 1961 and 1963 with a capacity of 40 (forty) beds.
Since Repelita I up to Repelita IV with APBD funds and third party assistance, physical infrastructure facilities have been developed by building additional buildings and replacing old buildings that are no longer suitable to the needs.
Now has changed one by one building and a beautiful architectural style ![image]
left outer impact
()side external impact
Impact in the room with the person being treated
external impact of inpatient room building
5.The external impact of the building space IGD
6.miniatur
7.add follow me