The hospital is a place for us to treat and hope for everyone

in #culture7 years ago

The condition of the physical infrastructure building of Cut Meutia public hospital before the repelita is still very simple, ie in the form of Dutch heritage buildings. Additional buildings built in 1961 and 1963 with a capacity of 40 (forty) beds.

Since Repelita I up to Repelita IV with APBD funds and third party assistance, physical infrastructure facilities have been developed by building additional buildings and replacing old buildings that are no longer suitable to the needs. image

Now has changed one by one building and a beautiful architectural style ![image]

  1. left outer impact
    ()

  2. side external impact
    image

  3. Impact in the room with the person being treated
    image

  4. external impact of inpatient room building
    image

5.The external impact of the building space IGD
image

6.miniatur
image

7.add follow me
image