Started digging the trench for a retaining wall. Starting with the smallest side (about 24 ft), and then will scale out to the full 240 ft when my materials are delivered.
Started digging the trench for a retaining wall. Starting with the smallest side (about 24 ft), and then will scale out to the full 240 ft when my materials are delivered.