Another day another post about my working process 😁
Hey guys today will also be a short post about my work.
Upon arriving to my work,we immediately departed from our workshop because our assignments was already decided in yesterday by our service manager.So we went to the destination and dropped off all of our belongings and working tools.
As soon as we arrived my senior said we need to install a elevator control box which contains several switches to control the elevator floor.So as he said,I immediately went up to the final floor (the fourth floor) and started installing the boxes.Installing them wasn't easy because I also have to install the control wire that will be connect with the box later.So I also have to install the PPC pipe (in case you don't know=We started running the electric pipe with wires) After installing all the top to the bottom floors with control boxes,we break for lunch.Also some pics of the work.
After having lunch and chit chatting,we started our works again.After finished installing the boxes,I went to help my senior.At that time he was installing some safety devices for the elevator and it wasn't an easy job also.The photo might be better explanation for everyone.
After installing all of that ,the sun was set and it was already dark outside.We didn't notice it because we are inside the building that has no lights or what so ever.So we called it a break for today and packed everything and went back to our workshop.When we arrived, it's already past 8,So we straight head back to our home.And also I have to remind you that this work isn't over yet,so the next day update will be the part two of it.Hope you guys enjoyed reading about it and have a great day, Peace ✌️