On this occasion, I want to continue my daily in campus part 2, this time our project is make a drainage canal.
The first step, we must mark 2 points within 5 m and digging as deep as 1 m using a hoe and shovel. After that we dig the side of the hole left and right with a slope that has been determined to the bottom of the hole that we dug it.
After that, we measure the basic slope of the canal by using the unting.
Then place the pre-molded concrete in the center of the drain hole. After that cement the edges and holes between the concrete with a concrete mix.
After all is done, then the results of the work will be assessed by the field supervisor
Thanks for visiting my blog, I hope it can useful for you. Don't forget to upvote and resteem this post to share with your friends. Follow me to the next update article.
***STEEM ON***
Nice post, good information.
You are making the engineer people feel happy
Keep on steemin
I glad to know that you happy with my post
Steem onThankd @aumbamumang
Very interesting
Thank tou
bohlimeng bohlimeng
kerja2
Pu kapeugah
Congratulations @wahyunahrul! You have completed some achievement on Steemit and have been rewarded with new badge(s) :
Click on any badge to view your own Board of Honor on SteemitBoard.
For more information about SteemitBoard, click here
If you no longer want to receive notifications, reply to this comment with the word
STOP