Today's post is a little late because I came home a little late.These days, there are days when I come home late from the office with more and more work.
The work I did today was very little. The reason I was late was because I was out of town. The work was about the installation of a dual meter panel for a 11KV transformer at a water factory. The installation time was not long. It took a long time to talk to the people in the factory. When we went to install the factory, the CT coils that came with us were 500/5. I actually checked and the Load Ampere they will use is higher than the Ampere of the equipment we brought.
So, I ordered the equipment that will match the load that we will actually use in this factory. The place where we arrived was far away, and we had to wait for more than 1 hour. The equipment was not much, but the journey was quite uncomfortable. When the equipment arrived, it was almost noon, so I decided to have lunch first and thought about continuing after eating. After eating, we immediately started working.We drew the wires needed to install the panel, put the CT coils in the wires coming from the transformer, and completed the work. I will show you the pictures of the work.
As you can see in the letter and in the picture, it didn't take long to do it. As I said above, it took longer to talk than to work and to wait for the material to arrive. The work is not yet finished because they have to connect the cables we drew to the transformer. We have to give the power to the meter, so I can add the setting.So I told their boss that it was finished, and they said that they would call me tomorrow after it was ready, and we returned to the office. So this is the work I did today.
Have a nice day
Goodnight 😘