this is the second car, the first one they sold at a 30% loss (plus all the expenses) and apparently they don't even have a race setup for the new one, Monaco is unknown at this point. So much value!
Yep. That's the result of not approaching the projects from a business point of view...
The first thing should be defining goals and deliverables. Measurable. Then tracking them along the way. And then perhaps cutting the projects that completely fail reaching them...
I guess we need a yacht, the car was not enough.
this is the second car, the first one they sold at a 30% loss (plus all the expenses) and apparently they don't even have a race setup for the new one, Monaco is unknown at this point. So much value!
Yep. That's the result of not approaching the projects from a business point of view...
The first thing should be defining goals and deliverables. Measurable. Then tracking them along the way. And then perhaps cutting the projects that completely fail reaching them...
lmao