Greetings everyone, my work today was the construction of electrical installations for the renovation of a house. First of all, I went to a store that sells materials and took notes on what materials are needed, and I bought the necessary materials
Since it was the weekend today, I had to not make too much noise, so I quickly finished my crimean business. After doing my Crimean works, I started fixing the cases where I will install the sockets, I fixed the cases with plaster and plaster mortar
Unfortunately, I couldn't pull the electrical pipes and cables today, if I tried to pull, the cases would play and I would have to freeze them again, so I preferred to leave the piping and cable pulling tomorrow. Because they broke the bathroom wall, I canceled the electrical connections and cut off the excess pipes
We had to make led lighting for a customer tomorrow, and for this purpose, I first cut and prepared the led lamps in the dimensions I bought. Later, I cut the cables short enough to add them, it will be better to keep the cables short, as the connection points will not be very visible anyway. I fixed the cables on the led with the soldering machine, as can be seen in the picture, it happened very nicely, tomorrow it's left to assemble
For the best experience view this post on Liketu
Congratulations @benyamin!
You raised your level and are now a Minnow!
Check out our last posts:
Support the HiveBuzz project. Vote for our proposal!