The white line that frames the bedroom is a 3cm x 3cm metal square tubing that will help create the 3cm step to stop rain water from going inside. It will be removed once the concrete is cured.
Metal base plates for the columns at each angle.
The concrete columns that will support the outer part of the floating slab which will become the floor of the living room are complete.
Metal to reinforce the beams of that concrete slab.
The steps of the outside corridor that will lead to the entrance of the workshop are taking shape.