20210915 Bungalow construction (gutter lean concrete) - day 71

in Pentarchitecture3 years ago (edited)

The gutter in front of the property has been excavated and is receiving a bottom layer of lean concrete before the concrete gutter is made
IMG_8629.jpg

Lean concrete was just poured and is still in liquid form.
IMG_8611.jpg
IMG_8618.jpg
IMG_8627.jpg
IMG_8628.jpg
IMG_8630.jpg

Sort:  

Hi please which phone do you use in taking these amazing photos?