Part 3/9:
The project began with some necessary preparations on the property. There was tree clearing, ground levelling, and logistics surrounding the arrival of construction materials. Energized by the vision, a significant partnership with the sponsor, Jackery, provided the necessary power to support the build entirely off-grid. With tools powered by Jackery's portable power stations, construction commenced.