Part 3/8:
The study noted two distinct signals during the Garner reactor's operation, with one signal being easily interpretable while the other required deeper analysis. The research team conducted rigorous analysis and concluded that the reactor successfully managed expected radiation levels throughout its testing phase. Surprisingly, no significant radiation signals were detected during the 32 days of testing, posing a critical question regarding radiation emissions' behavior.