Part 2/9:
Late October was marked by significant advancements for New Glenn: the rocket's BE-4 engine, a crucial component, was installed, and by early November, the rocket's second stage had been integrated. November 21 held promise as New Glenn was rolled out to Launchpad LC 36, yet what followed was not the anticipated testing. Instead, the rocket was disassembled and rolled back down on multiple occasions with little to no substantial activity occurring.