You are viewing a single comment's thread from:

RE: LeoThread 2025-02-14 19:31

in LeoFinance7 days ago

Part 4/8:

The focus then shifted specifically to the stamping pits, where changes were happening at an impressive pace. New footings were visible, showcasing a foundation designed to meet the rigidity required for stamping operations. The different structural specifications, including potentially concrete-reinforced posts for stability, were a pivotal point in Zangler’s commentary. This change, as he speculated, may cater to the high vibration requirements necessary for stamping work.