Part 6/9:
Once constructed, the elements are transported on skidding beams to the water's edge and lowered to sea level, where special tugboats maneuver them into place. The elements are then joined together using rubber seals to ensure watertight integrity. A double bulkhead design and 'Omega sealing' method are incorporated to provide additional safety, ensuring that if one side encounters challenges, the other remains functional.