Part 3/9:
Planners quickly ruled out the construction of a bridge due to the potential national security risk it posed. A bridge's collapse could entrap the Atlantic fleet, making a tunnel the most viable option. The first tunnel was completed in 1957, designed to facilitate approximately 60,000 vehicles daily. However, with peak traffic reaching 100,000 vehicles, an expansion became essential.