Technical experts from Rio Tinto and Oyu Tolgoi have worked closely with SPIC and truck manufacturer Tonly to adjust equipment design to align with Rio’s electrical and truck safety requirements. The trucks will perform tailings dam rehabilitation work and topsoil movement and be operated and maintained by Oyu Tolgoi personnel.
You are viewing a single comment's thread from: