The AFP machine will dramatically cut down on production time, saving over 150,000 hours. This will enable Rocket Lab to launch more frequently and at a lower cost, making it a game-changer for the aerospace industry. The machine will not only be used to produce the Neutron rocket but also various small carbon composite structures, including Electron first stages, and other spacecraft parts. Rocket Lab plans to launch the first Neutron rocket in 2025.
You are viewing a single comment's thread from: