Earthworks Using Excavator

Hello Everyone

Today I will share about the earthworks that I am doing in the mountains of Mount Salak km 35 Aceh-Indonesia. the implementation of this work aims to form land that will be used as a restro location that carries the concept of nature and rivers. Earthwork we do using heavy equipment such as excavators as you can see in the photo below.



20210417_103020.jpg



20210417_081458.jpg



The area of land that we will do this time is 1 hectare and is on the edge of a cliff which has a beautiful view. the location which is located on the linsas street is really lively lhokseumawe at an altitude of 1000 masl. The soil character that we dig is clay mountain which is reddish yellow in color. the rock content is only about 1 percent with a diameter of 30cm to 2meter. with a location that has pine trees, it is very beautiful and cool so it is suitable for use as a hotel and restaurant location.



20210417_084739.jpg



20210417_081005.jpg



20210417_163122.jpg

The area of land that we will do this time is 1 hectare and is on the edge of a cliff which has a beautiful view. the location which is located on the linsas street is really lively lhokseumawe at an altitude of 1000 masl. The soil character that we dig is clay mountain which is reddish yellow in color. the rock content is only about 1 percent with a diameter of 30cm to 2meter. with a location that has pine trees, it is very beautiful and cool so it is suitable for use as a hotel and restaurant location.



20210417_120425.jpg



Implementation of 1 hectare of earthworks using an excavator takes 1 day. for the excavation and shaping process, it consumes 140 liters of diesel.

Implementation of 1 hectare of earthworks using an excavator takes 1 day. for the excavation and shaping process, it consumes 140 liters of diesel.

that's my little explanation through writing on this blog, hopefully it will be useful.

Sincerely @irwanumpal