In the process costing system, the cost object is the different phases of the production process, the costs are accumulated in each one during a period of time, where the phases of the production process are called cost centers, departments or sub-processes.
(Image not shown due to low ratings)
(Image not shown due to low ratings)
Images were hidden due to low ratings.
This is very true. Thanks for sharing.