On this occasion, one of my main activities was the electrical installation of the basement drainage system.
Two rectangular boxes were placed with joints, three small stencils were cut to make the connection and the joints were spliced.
This report was published via Actifit app (Android | iOS). Check out the original version here on actifit.io