very informative @smithlabs and the 9 1/2 ft ones would be ideal but don't railroad ties eventually rot away?
You are viewing a single comment's thread from:
very informative @smithlabs and the 9 1/2 ft ones would be ideal but don't railroad ties eventually rot away?
They last for 50 years on the railroad, and I won't load them as hard. So yes, but someone else will need to fix it, LOL!
I plan on tying in the building on the load points where they stack the upper contailers. When the rest of the building is done, I will cut doors in the sides for inside access!
:)