Here we are going to talk about ground work to established the Cable Wires of Reliance Jio Communication".
100% Real Ground Reporting.
Mechanistic---
These tools are used to set the older ground wire to caught up new Black Wire, we can say this is also a mechanical Fuel reflected Motor.They are using this machine providing by the Reliance Company Owns.Workers are competent in their work. Symbol of this machine elastrate everything.
These tools are also as equal important as the first one.Look at the ground digger and wheel machine of wood.These two tools are also used to connect the ground wire with the new settled wire.
Quail Filter machine and Cover Strong wire or pipe is there to covered the delicate wire which will protect main capable wire safe to consume better network capacity.
Working Boy in ground.He is testing wires as they are working or not ! After he will connect ground touched wire to it upper case wire.I also talked with that boy.
I: How do you connect the wires?
He: Hello, this is hard to connect the wires directly so, we will first test the capacity of range covered and with set up the Black connector wire through or Dumping machine which will be connected in next point again with the same process.
I: How much time that take?
He: Around, 2-3 Hours, after a hole digging on ground.
I: Where are you from?
He: Uttar-Pradesh, India.