The part two of yesterday working progress on elevator service ✌️

in #parttwo β€’ 8 months ago

Welcome 😊 ladies and gentlemen πŸ˜‰
Of course today post will be the continuous of my yesterday works.So without further a do, let's straight go to the point.

After we returned to our homes, take a good cool shower 🚿 enjoy our delicious meal and the last I go to bed at 12PM because when I finished all of my chores,I sit back and relax using my phone.Until midnight I don't sleep πŸ’€πŸ˜…So yeah I am that type of guy.Anyway upon waking up at morning and prepared for my work.As always I arrived to my workshop at 9:00 AM.And then as always decided what our's today assignment will be and prepared what we have to do.

Of course we got our unfinished job,so we grabbed our things, jump into the car and straight go to the destination πŸ˜‰We don't have much left to do at the place πŸ˜• so we decided we will do it slowly but safely,neat and tidy.The work we have left was no much,just installing the control panel and connecting some wires to the motor and giving the electricity to the panel.After arrived,I started at installing the panel,Oh boy..🀠 it looks nice and neat.Let me show you the photo of it.


Damn would you look at that amazing right?🀩
After installing the panel,I did a break and go to have my lunch with my senior and other workers πŸ˜€ the place where we have our lunch have a very neat place (The tea house) not that kind of tea house like in your country.In our country (Myanmar) has a different kinds and styles of tea house.If you are one of the readers from Myanmar that currently reading right now,feel free to share your thoughts about my post and also about the tea house.And also if my writing was incorrect feel free to show me.

Anyway let's head back to the main topic.After having lunch we rest a little bit πŸ˜…(resting not enough I seeπŸ™ˆ)
and talking some nonsenses and sleep a little bit 😌 (yeah we did sleep all of usπŸ˜‚)at least I'm not the only one you know πŸ˜„ after that we finished what we need to be done like checking the elevator safety device, inputting the electricity to the control panel, checking the floor control boxes and finally test running the elevator.

Of course I do my work perfectly so it went smoothly when we test drive the elevator.We test it up and down a little amount of time.Of course...I will show you the progress.


I have a footage of driving the elevator but I can't post about it.In case if you know about it please tell me how can I post it and upload it.

After that we packed our things, check βœ… everything and went back to our workshop.So that's all about the work we're doing right now.I will be updating my new progresses in the next day.
See you soon πŸ’ Goodbye πŸ‘‹