he airlock and sail wall now protect the building from the heat but cool the air in such a large room is not just a hotel Now boasts the world's largest hill with 180 m high ceilings warm air contains more moisture than cold if this hot humid air cools down uncontrolled condensation of caviar on the ceiling of the school could have formed a rain cloud that caused a huge damage to the interior design To avoid the formation of clouds will need to spend valuable time contractors include the system air cooling and lowering the temperature inside the building every day by 1 degree. This is very slow. We started lowering the temperature of the air in the building. In June 1998, we reached comfortable levels. In December of the same year, we could start working on an interior design search for a designer who would have created a luxurious interior worthy of a neck This is a new delay Wang Chu who has already worked for the Sultan of the Brunei knows how to cater to the taste of royalty when she agreed to work on the most luxurious hotels of the planet 202 on a magnificent and the rooms and height of the hill but it was only 24 months on the job to the hotel was ready to welcome guests to the celebration of the new millennium, the schedule has been very busy the whole design company, all 50 designers left the other and worked only necessary interior Arab Towe