Day 10 Forms,Drilling, & Excavations

So far we have been moving right along. Schedule is staying just about the same even with the weather.

51B73DD8-F1DD-440B-A30B-2D22DF93A4F4.jpeg

We got 5 pilons drilled, then on to receiveing trucks delivering Forms and Mats.

ECBDB514-0B31-42E7-90A8-3EB2D02C70F1.jpeg

046D5D2C-9437-4DA4-ACD3-AEAB78841F04.jpeg

9E7B2606-EEC8-418A-BD40-01716D6BE04B.jpeg

Considering all the rain we have gotten the excavations are coming along pretty good.

A1B24530-79F1-42F7-8B09-334C255F68A1.jpeg

7E4FA8D8-406C-40EA-A87F-5A40D1C53D0E.jpeg

2A982B60-773D-4008-8E1E-6B4ED2CF99FD.jpeg

So until next time take care and be safe 🇺🇸🇺🇸🇺🇸