I am not doing much actually... but I wish there was a way to dynamically take my SP and use it like... at the end of the day... for something I could choose...
Then I could evaluate within 7 days that allocation.. and rectify if needed.
I am only 3200 SP (with 1000 delegated) but I think many will recon what I am trying to say.