what are the specific, measurable, and timely goalposts by which we can judge whether the EIP has performed
@trafalgar is probably the best one to answer this or perhaps he can point to some existing posts to answer it.
what are the specific, measurable, and timely goalposts by which we can judge whether the EIP has performed
@trafalgar is probably the best one to answer this or perhaps he can point to some existing posts to answer it.