A gutter roof floor linking of water under the roofdeking,
This is Gutter roof
THE PROCESSING OF THE FELT
We need to clean and clear all dirty that on the surface , After that we start the primer paint on the floor, with painting roller , Because of the dust on the floor .
After the primer paint we have to leave it for like 24hrs
if the time reached we can start the laying of the felt with Gas fire.
We need to care about the joint of felt , must be seel very well .And care with the drainage of water must not be blocked at all .like this
AFTER THE WORK FINISHED
kind to remind you the product am using is DR FIXIT
.