Thanks for the support! I usually have them staggered, but where there's doorways/breaks in the wall, I'll do vertical stacks if I don't have materials for a filler section, which they use lathe & cement to fill in the Earthship school. You can see in the back how I used tiny tires and some Trex scraps to continue the wall up to the right side of the arch with no material cost
Thanks for the support! I usually have them staggered, but where there's doorways/breaks in the wall, I'll do vertical stacks if I don't have materials for a filler section, which they use lathe & cement to fill in the Earthship school. You can see in the back how I used tiny tires and some Trex scraps to continue the wall up to the right side of the arch with no material cost